JAIPRAKASH HYDRO POWER LIMITED (JHPL)
Project:
Jaiprakash Hydro Power Ltd. (JHPL), a subsidiary of Jaiprakash Industries
Ltd. (JIL) has set up 300 MW Baspa-II Hydro-Electric project, a run of the
river scheme, located at River Baspa in District Kinnaur of Himachal
Pradesh, in private sector on Build, Own and Operate basis, which has come
into full commercial production in June,2003.
Completion Cost and Funding of the Project:
The project cost has been appraised by ICICI Bank Ltd. (ICICI), the Lead
Institution, at Rs.1612 crores including margin money of Rs.16.12 crores.
The financing of the project, based on Debt-Equity ratio of 70:30 is as
below:
(Rs.
in Crores)
Equity 491.00
Rupee Term
Loans 902.00
Foreign Currency Loans
(including Buyer’s Credit)
in equivalent
rupees 219.00
-----------
Total 1612.00
=======
Saleable Energy:
·
Saleable Primary Energy :
1050
million units
·
Saleable Secondary Energy :
155
million units
|