Chamera Concrete Gravity Dam

The Chamera Concrete Gravity Dam is across the river Ravi and is part the Chamera Hydroelectric Project. Concrete placement was accomplished by cable crane and tower cranes.


Principal Quantities of Work
Crest Length 255 M
Height 140 M
Chilled Chilled Concrete to be Placed About 1.4 million cum
Excavation  
Common 1,245,345 Cubic meters
Rock 481,067 cubic meters
Abutment excavation 232,843 cubic meters
Fill in coffer dams 515,627 cubic meters
Shotcrete 14,724 Ton
Drilling concrete 27,900 M
Chilled Concrete 1,378,864 cubic meters
Form work 237,068 square meters
Chilled Concrete in intake structure and diversion tunnel lining 23,372 cubic meters
 Reinforcements 14,807 MT
Anchor bolts and other metal works 1,055 MT